ATTENTION: Citizen Access will be unavailable Thursday, October 9 at 5:00 PM to Monday, October 13 at 6:00 AM for scheduled maintenance and updates. We apologize for the inconvenience.

El Niño

Winter Storm preparedness

El Niño Preparations: Permit Options for Coastal Areas Along the Shoreline

If there is an imminent threat to your property:

  1. Email: EmergencyPermitRMA@venturacounty.gov and call (805) 654-2488.
  2. Please include property address or Assessor Parcel Number, describe the nature of the emergency, and the scope of work requested.

Then begin the Emergency Coastal Development Permit application and Planning staff will reach out with further instructions.

Coastal community with beachfront houses, waves crashing against rocky shore, and American flags visible on structures.

Background

Governor Newsom proclaimed a State of Emergency directing state agencies to prepare for the 2026-27 El Niño season (Governor’s September 21, 2026 proclamation). In coordination with the Governor’s Proclamation, the California Coastal Commission released an informational memo (Coastal Commission’s September 11, 2026 informational memo) and created a webpage specifically for the El Niño preparation (California Coastal Commission’s El Niño preparation webpage). Additionally, the Ventura County Board of Supervisors received a presentation on October 6, 2026 regarding the status of County preparations for a strong storm season resulting from predicted El Niño conditions, with recommendations for community members (see Board of Supervisors October 6, 2026 Agenda Item 39). The Planning Division prepared a memo summarizing these state and local efforts to prepare for El Niño and how they apply to coastal shoreline areas in the unincorporated county (Planning Division’s El Niño Advisory Memo).

For property owners in coastal Ventura County, there are three pathways to authorize preparation of sites along the shoreline for the 2026-27 El Niño season:

These options are described in more detail below.

Option 1: Temporary Protective Work

This option is described in the Coastal Commission’s September 11, 2026 informational memo and includes sand berms, sandbags, and other similar measures. The temporary protective work should be the minimum amount of work necessary to address the hazard and is required to be removed by a set date. After receipt of the application, County staff coordinate with Coastal Commission staff to determine if the temporary protective work qualifies for a waiver, and based on both agencies’ reviews, the Planning Director may include additional requirements. If the temporary protective work does not qualify for a waiver, then an Emergency Coastal Development Permit (CDP) is needed (see Option 3).

To help ensure an application for temporary protective work can be authorized with a waiver, please consider the following criteria:

  • No impact on the environment or to public beach access.
  • Temporary and removable.
  • Removal timeframe likely in April 2027.

To apply for a Temporary Protective Work Waiver:

Option 2: Limited Ministerial Repair and Maintenance of Shoreline Protective Devices (Zoning Clearance)

This option is codified in Coastal Zoning Ordinance Section 8175-5.12.3, which allows:

  1. If dislodged by natural hazards, restacking of less than 20 percent of existing rock revetment materials to recreate the legally established design and dimensions of the shoreline protective device.
  2. Application of protective coatings (e.g., protective weather sealants applied to device surfaces, cracks, and spalling) that are no thicker than 2 inches and do not result in additional device height, or alter visual impacts due to color, texture, and/or other design treatments, as compared to the legally established structure that is a shoreline protective device.

Work must meet the following standards:

  • Prohibition of mechanized equipment on the beach area.
  • Development is prohibited in ESHA, or within 20 feet of coastal waters or streams.
  • All coatings shall be non-toxic once cured.
  • Prohibition of the placement of shoreline protective device or constituent materials, seaward or landward compared to the existing legally established device.
  • Construction activities are prohibited when wave run-up reaches the seaward side of the work area and/or when dangerous conditions (e.g., due to high winds or rainfall) are forecast.
  • Development shall not adversely impact public access.
  • After completion of daily work, solid and liquid debris shall be collected and disposed off-site.
  • All work shall be performed under direction and approval of a project engineer.
  • Shall comply with construction site best management practices.
  • For revetments, a pre-work survey and post-work elevation certificate is required.

To apply for a Zoning Clearance for Repair and Maintenance of Shoreline Protective Devices:

  • Submit the Zoning Clearance deposit of $1,200.

The repair and maintenance of the shoreline protective device may be subject to review and permits from other County agencies for compliance with the Building Code and Floodplain Ordinance. The applicant is responsible for coordination with the following agencies to determine if another permit is required for the repair and maintenance request:

Option 3: Emergency Coastal Development Permit (Emergency CDP)

This option is consistent with the Public Resources Code Section 30611 and Coastal Zoning Ordinance Section 8181-3.7 and it can be applicable to repair legally permitted shoreline protective devices. Eligible activities include replacement rocks on rock revetments and more extensive repairs of seawalls. The Emergency CDP application should be the minimum amount of work necessary to address the emergency. A full CDP application (Discretionary Approvals page) is required within 90 days of issuance of the Emergency CDP unless an extension is granted by the Director. Based on the project scope, a consolidated permit with the Coastal Commission may be required. A consolidated permit allows for one single, combined permit to be approved by the Coastal Commission when a permit is required by both the Commission and local government, this allows for streamlined review.

To apply for an Emergency Coastal Development Permit:

Contact Us

Inquiries may be directed to the Planning Counter coastal El Niño permitting team, at (805) 654-2488 or by e-mail to EmergencyPermitRMA@venturacounty.gov.

Translate Disclaimer

The vcrma.org website has been translated for your convenience using translation software powered by Google Translate. Reasonable efforts have been made to provide an accurate translation, however, no automated translation is perfect nor is it intended to replace human translators. Translations are provided as a service to users of the Ventura.org website, and are provided “as is.” No warranty of any kind, either expressed or implied, is made as to the accuracy, reliability, or correctness of any translations made from English into any other language. Some content (such as images, videos, Flash, etc.) may not be accurately translated due to the limitations of the translation software.

The official text is the English version of the website. Any discrepancies or differences created in the translation are not binding and have no legal effect for compliance or enforcement purposes. If any questions arise related to the accuracy of the information contained in the translated website, please refer to the English version of the website which is the official version.